True

Additional connection to the electrical system in the hall (does not include extra KW)

1.00 € 1.00 € 1.0 EUR

1.00 €

(0% Off)

Cod: IE100


Days
Hours
Mins
Secs
  • EXTRA CONNECTION TO THE ELECTRICAL NETWORK IN THE HALL

This combination does not exist.

UNIT PRICE

Insert Quantity

1.00 € EUR 1.0

VAT excluded

Unit(s)


Description

CONNECTION PROCEDURES
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).

CONNECTION PROCEDURES
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).

To install this Web App in your iPhone/iPad press and then Add to Home Screen.